CE 78 Joint Filler 120 '
Quick dry jointing
And filling plasterboard joints
ADVANTAGES
- Easy to use
- Fine white finish
- Easy to sand
- Low shrinkage
TECHNICAL DEFINITION
CE 78 Joint Filler is a powder designed specifically for jointing tapered edge plasterboard in combination with a joint tape.
CE 78 Joint Filler is a powder designed specifically for jointing tapered edge plasterboard in combination with a joint tape.
TECHNICAL CHARACTERISTICS
- WORKING TIME : 2 hours
- Ahdesion: Strip adhesion > 1,000 g
- Cracking: No cracking up to 5 mm thickness
- Density : 0,9
- Reaction to fire: A1
PACKAGING
25 and 15 kg bag
25 and 15 kg bag
COMPOSITION
Powder filler based on plaster, calcium carbonate, resin and various additives.
The paste obtained is white.
Powder filler based on plaster, calcium carbonate, resin and various additives.
The paste obtained is white.
SUITABLE SUBSTRATES
All types of plasterboard with or without insulation (glass wool, rock wool, polystyrene) with tapered edges and paper face.
All types of plasterboard with or without insulation (glass wool, rock wool, polystyrene) with tapered edges and paper face.
STORAGE
9 months in original unopened package, protected from damp.
9 months in original unopened package, protected from damp.
SUBSTRATE PREPARATION
Plasterboard must be attached in confoRmity with DTU 25.41 and 25.42
Cuts made into plasterboard must be on the bevel and dusted.
Plasterboard must be attached in confoRmity with DTU 25.41 and 25.42
Cuts made into plasterboard must be on the bevel and dusted.
MIXING RATIO
From 10 to 11 l of water per 25 kg sack.
1 volume of water + 2,5 volumes of powder.
From 10 to 11 l of water per 25 kg sack.
1 volume of water + 2,5 volumes of powder.
USE
Before jointing fill gaps between boards and any irregular joints and repair any damaged board.
Apply manually by using a 10 or 15 cm filling knife and apply the tape - milled face against the board. Then apply a finish coat, allow to dry and finish to cover the tape.
Also cover screw heads.
Apply a tape into the ceiling joins and ensure that the concrete is free of any signs of mould-release oil.
For vertical protuding angles use a reinforced tape (metal side against the board) or a metal angle bead.
Before jointing fill gaps between boards and any irregular joints and repair any damaged board.
Apply manually by using a 10 or 15 cm filling knife and apply the tape - milled face against the board. Then apply a finish coat, allow to dry and finish to cover the tape.
Also cover screw heads.
Apply a tape into the ceiling joins and ensure that the concrete is free of any signs of mould-release oil.
For vertical protuding angles use a reinforced tape (metal side against the board) or a metal angle bead.
APPLICATION TIP
To prevent furring do not sand the paper face of the board before applying the primer.
To prevent furring do not sand the paper face of the board before applying the primer.
DRYING TIME
Second coat may be applied 4 hours after application of the first coat.
Second coat may be applied 4 hours after application of the first coat.
CONSUMPTION
Approximately 350 g/m² of plasterboard
Approximately 350 g/m² of plasterboard
COVERING
Primer undercoat for plasterboard
Plaster-based smoothing filler
Primer undercoat for plasterboard
Plaster-based smoothing filler
PRÉCAUTIONS_DEMPLOI
The temperature during application and drying must be between 5 and 30°C.
Do not apply to damp substrate.
Do not use mix that has begun to set.
The temperature during application and drying must be between 5 and 30°C.
Do not apply to damp substrate.
Do not use mix that has begun to set.