99 Multi-purpose
Indoor coating
Compund
ADVANTAGES
- No synthetic resins
- 500 times lower voc emissions than the a+ threshold
- All-round multi-purpose product
TECHNICAL DEFINITION
Multi-purpose powder coating for use on indoor walls.
Erecting plaster block partition walls.
Bonding plasterboard with or without insulation.
Jointing plasterboard.
Erecting cellular concrete block partition walls.
Filling holes and cracks.
Levelling damaged walls.
Smoothing surfaces.
Multi-purpose powder coating for use on indoor walls.
Erecting plaster block partition walls.
Bonding plasterboard with or without insulation.
Jointing plasterboard.
Erecting cellular concrete block partition walls.
Filling holes and cracks.
Levelling damaged walls.
Smoothing surfaces.
TECHNICAL CHARACTERISTICS
- Ahdesion: Compliant with NF T 30 608
- Setting time: 2 h
PACKAGING
5 and 15 kgs bags
5 and 15 kgs bags
COMPOSITION
Marble powder, natural plaster, clay and cellulose.
Does not contain synthetic resin.
The paste obtained is cream coloured.
Marble powder, natural plaster, clay and cellulose.
Does not contain synthetic resin.
The paste obtained is cream coloured.
SUITABLE SUBSTRATES
All types of indoor walls: plaster, plasterboard, plaster blocks, concrete, cement coating, breeze blocks, cellular concrete, bricks, terracotta, old paintwork, etc.
All types of indoor walls: plaster, plasterboard, plaster blocks, concrete, cement coating, breeze blocks, cellular concrete, bricks, terracotta, old paintwork, etc.
STORAGE
9 months in original, unopened packaging protected from damp.
9 months in original, unopened packaging protected from damp.
SUBSTRATE PREPARATION
The surfaces must comply with DTU 59.1, meaning they must be clean, dry, sound, hard, dust-free and free from any trace of formwork oil.
Open cracks properly. Scrape, sand and wash old paintwork.
The surfaces must comply with DTU 59.1, meaning they must be clean, dry, sound, hard, dust-free and free from any trace of formwork oil.
Open cracks properly. Scrape, sand and wash old paintwork.
MIXING RATIO
Bonding and filling : 1 volume of water for 2 volumes of powder.
Smoothing : 1.5 volumes of water for 2.5 volumes of powder. 7.5 to 9 L of water per 15 kg bag (or 2.5 to 3 L per 5 kg bag) depending on the type of work.
The lower the amount of water, the less shrinkage there will be.
Bonding and filling : 1 volume of water for 2 volumes of powder.
Smoothing : 1.5 volumes of water for 2.5 volumes of powder. 7.5 to 9 L of water per 15 kg bag (or 2.5 to 3 L per 5 kg bag) depending on the type of work.
The lower the amount of water, the less shrinkage there will be.
USE
See technical sheet
See technical sheet
DRYING TIME
8-24 hours depending on the work.
8-24 hours depending on the work.
CONSUMPTION
Depends on the thickness of the blocks:
For blocks with a thickness of 5 cm, coverage is 1 kg/m²
For blocks with a thickness of 7 cm, coverage is 1.4 kg/m².
For blocks with a thickness of 10 cm, coverage is 2 kg/m².
Bonding plasterboard with or without insulation :
One 15 kg bag for 4.8 to 9.6 m² of plasterboard (1.5 to 3 kg/m² of plasterboard depending on the number and thickness of the dabs).
Jointing plasterboards : One 15 kg bag for 42 m² of plasterboard (approximately 350 g/m² of plasterboard).
Erecting cellular concrete block partition walls : Approximately 5 kg/m2.
Filling : 1 to 1.2 kg/m2/mm of thickness.
Smoothing all surfaces : 250 g to 400 g/m2.
Depends on the thickness of the blocks:
For blocks with a thickness of 5 cm, coverage is 1 kg/m²
For blocks with a thickness of 7 cm, coverage is 1.4 kg/m².
For blocks with a thickness of 10 cm, coverage is 2 kg/m².
Bonding plasterboard with or without insulation :
One 15 kg bag for 4.8 to 9.6 m² of plasterboard (1.5 to 3 kg/m² of plasterboard depending on the number and thickness of the dabs).
Jointing plasterboards : One 15 kg bag for 42 m² of plasterboard (approximately 350 g/m² of plasterboard).
Erecting cellular concrete block partition walls : Approximately 5 kg/m2.
Filling : 1 to 1.2 kg/m2/mm of thickness.
Smoothing all surfaces : 250 g to 400 g/m2.
COVERING
Once the coating is fully dried, it can be covered with all types of paint, finishing compounds, wallpaper paste or wall covering.
Once the coating is fully dried, it can be covered with all types of paint, finishing compounds, wallpaper paste or wall covering.
PRÉCAUTIONS_DEMPLOI
La température à l’application et pendant le séchage doit être comprise entre 5 et 30° C.
Ne pas appliquer à un taux d’humidité >70 %.
Ne pas appliquer sur support humide.
Ne pas utiliser de pâte ayant commencé à durcir.
La température à l’application et pendant le séchage doit être comprise entre 5 et 30° C.
Ne pas appliquer à un taux d’humidité >70 %.
Ne pas appliquer sur support humide.
Ne pas utiliser de pâte ayant commencé à durcir.